OUR PROJECTS

We’ve handled projects from big to small and everything in between. We are skilled at on-site project management and equally competent when it comes to study work or unlocking hidden opportunities within your existing business.

ExperienceSiteProject
NyrstarMyra FallsProject Manager: Paste Plant Retro-Fit Capital Project Management – $15M
NyrstarMyra FallsProject Manager: 9MW Diesel Power House Construction – $7.2M
NyrstarMyra FallsMine Design/Stope Design
Nord GoldNord GoldMine Design/Schedule
Nord GoldNord GoldBlock Model Conversion and Validation
Nevada CopperPumpkin HollowPre-Feasibility: Mine Design & Schedule
GoldcorpHollinger/Dome MineOver the shoulder training and long range planning model set-up
Stornoway DiamondsStornowayConvert and combine resource models
Orvana Minerals CorpOrovalle/ElValleStope Optimization, mine design, and Life of Mine schedule case/scenario analysis.
Orvana Minerals CorpDon MarioOpen Pit Optimization and subsequent pit design
Underground FeasibilityCoringa, Magellan Minerals Ltd.Project Manage Mining Component of Feasibility including creation of Mineral Inventory, Mine Design, and Mine Schedule to an NI43-101 Standard
Open Pit OptimizationDon Mario, Orvana Minerals Corp.Conducted an Open Pit Optimization using Deswik Software to analyse the effects of various economic parameters to an operating Open Pit. Provided strategic consultation services to the Director of Engineering.
Open Pit Strategy and Software ImplementationKitsault Mine, Avanti Mining Ltd.Project Manage the conversion of an excel based Open Pit Mining Schedule to the Deswik Suite. Included implementation of haulage analysis, bench-by-bench re-sequencing, and complex grade blending incorporating variable value cut-offs.
Underground Stoping InventoryKensington Mine, Coeur Mining Inc.Create various Scoping Level Open Stoping Simulations using an array of economic parameters to test impact to size and quality of the mining inventories as part of an internal study.
Open Pit Design and SchedulingLaver & Aitik, BolidenLaver & Aitik Pit Design and Scheduling; Strategic Analysis including Haulage Analysis and Grade Blending
Open Pit & Underground ScheduleIzok Lake/High Lake, Mining Plus/MMGAssist with schedule set-up, provide best practice guidelines and approach
Deswik Software TrainingGoldex Mine, Agnico-Eagle Mines Ltd.Goldex Mine; Deswik Software Training & Implementation
Underground Design, Schedule, and CostingHDI HeatherdaleNiblack Underground Scoping Study
Open Pit OptimizationGlenburgh, Gascoyne Resources Ltd.PEA Level Open Pit Optimization Study
Preliminary Mid-Range Mine Plan/Deswik Software ImplementationEkati, BHPConversion of existing Mid-Range plans to Deswik Software format in conjunction with scheduling updates.
Deswik Software TrainingVal d’Or Technical Services, Agnico-Eagle Mines Ltd.Deswik Software Training; Agnico-Eagle Tech. Services Software Evaluation
Deswik Software Training & ImplementationKittilä Mine, Agnico-Eagle Mines Ltd.Kittilä Mine; Deswik Software Training & Implementation
Open Pit OptimizationSimberi Project, Allied GoldOpen Pit Optimization & Sensitivity Analysis
Resource Model ValidationBalabag Project; TVI Pacific Inc.; Georeference Online Ltd.Resource model check and validation (assist) for TVI Pacific Inc.’s Balabag Project; sub-consulting to Georeference Online Ltd.
Software TrainingGolder Ltd.Mineable Shape Optimizer training
Life of MineSimberi Project, Allied GoldLife of Mine scheduling
Life of MineCononish Gold Mine, Scotgold Resources Ltd.PEA level Life of Mine scheduling
Mining Method Review/Mine Design ReviewSterling Mine, Imperial Metals CorporationStrategic evaluation of mining method; Modified Sub-Level Caving Strategic evaluation of current development design
Mining Method Review/Life of MineMt. Polley Underground Mine, Imperial Metals CorporationStrategic evaluation of mining method Stope optimization/definition of mineable inventory Life of Mine design; Modified Shrinkage Stoping
Independent Cost StudyPanoramic ResourcesEstablish and report on current Canadian open pit operating costs
Operations Review and Life of MineWhite Mountain Mine, Eldorado Gold CorporationStrategic review of current operations Stope optimization/definition of mineable inventory Life of Mine design; Sub-Level Open Stoping with Cemented Hydraulic Fill and Cemented Rock Fill Life of Mine schedule Life of Mine cost estimate Assessment of additional fleet and fixed plant requirements
Life of MineWolverine Mine, Yukon Zinc CorporationLife of Mine design; Overhand Drift and Fill with Paste Fill Life of Mine schedule
Technical ReviewGC Project, Silvercorp Metals IncorporatedLife of Mine schedule
Pre-Feasibility StudyMinera Juanicipio Project, Fresnillo PLC & Mag Silver Corporation Joint VenturePEA level Mine schedule; Sub-Level Open Stoping with Paste Fill Surface infrastructure layout and design Capital and Operating cost modelling
Feasibility StudyChirano-Paboase, Red Back MiningFeasibility level mine design; Transverse Open Stoping with Cemented Rock Fill
Pre-Feasibility StudyChaquicocha, Minera YanacochaPre-Feasibility level mine schedule; Sub-Level Open Stoping with Paste Fill
Preliminary Economic AssessmentSan Julian Project, Fresnillo PLCPEA level mine design; Modified Avoca and local Cut and Fill
Preliminary Economic AssessmentJM Zone, Fresnillo PLCExample stoping sequence for large scale, Transverse Open Stoping arrangement
Preliminary Economic AssessmentPhoenix Gold Project, Rubicon Minerals CorporationPEA level mine design; Captive Cut and Fill with Rail Haulage Assist with Resource Definition Mineable Inventory Definition
Major Mine Design RevisionNew Afton Mine, New Gold IncorporatedInitial design work which re-defined the extraction and undercut horizons from a Herringbone style layout to an El Teniente style layout
Life of Mine Fleet SelectionNew Afton Mine, New Gold IncorporatedProject managed the initial stages of the Life of Mine Fleet selection process
Raise LiningNew Afton Mine, New Gold IncorporatedProject and field managed the installation of fibre reinforced shotcrete lining on a Life of Mine ventilation raise
Transfer Chamber Excavation DesignNew Afton Mine, New Gold IncorporatedProject managed the mining portion of the conveyor transfer chamber excavations from design through to implementation
Life of Mine Design and SchedulingNew Afton Mine, New Gold IncorporatedResponsible for all life of mine designs and schedules. This included monthly, quarterly, and annual tracking of actuals vs. budget
M24D/EPS/MineCADNew Afton Mine, New Gold IncorporatedSite wide software implementation which included evaluation of competing software, working with consultants to customize network and data structures, scheduling of training, and implementation of best practices
Open Pit Mining StudyNew Afton Mine, New Gold IncorporatedConducted a scoping level study to assess the viability of extracting near surface ore from the existing pit in order to supply early ore to the mill. This included the creation of a resource model, pit optimization, pit design, and management of supporting consultants
Pit Geotechnical InstrumentationKemess South Mine, Northgate Minerals CorporationEstablished design locations and various installation parameters to support the installation of vibrating wire piezometers and inclinometers in the pit wall to monitor movement
High Wall DewateringKemess South Mine, Northgate Minerals CorporationDesigned and field managed the installation of a major diversion trench to divert run-off water away from the high wall
High Wall Drill and Blast ProgramKemess South Mine, Northgate Minerals CorporationProject managed the implementation of a small-hole drill and blast program aimed at reducing blast induced damaged against the high wall. This included the selection and management of a suitable blast contractor, assistance with equipment selection, and blast design
Tailings Storage Facility Haul Road DesignKemess South Mine, Northgate Minerals CorporationDesign and economic evaluation of a suitable final haulage access for each remaining stage of the TSF build